Construction Scheduling, Cost Optimization and Management: A
by: Hojjat Adeli, Asim Salimul Karim
Publisher: Routledge
Print length: 280
Publication date: 2001-01-01
ISBN-10: 0203302230
ISBN-13: 9780203302231
Construction Scheduling, Cost Optimization and Management: A
by: Hojjat Adeli, Asim Salimul Karim
Publisher: Routledge
Print length: 280
Publication date: 2001-01-01
ISBN-10: 0203302230
ISBN-13: 9780203302231